Now that we’ve got the building permits, the guys at RE Construction are busy chopping out all the ACME remnants to give us a wide open space.
The scissor lift arrived, and by the time I posted this photo a whole lot more of the ceiling, and the remaining upper wall portions are being torn out. There’s already been a lot of progress since I took these photos.
That also means that the last few working light fixtures left over from the ACME have been removed – so it gets dark in there! You can also see a lot of old wiring. It looks like a mess but it’s actually much tidier than the “old wiring” we saw in other locations. Besides which, it’s all being removed so the brewery’s electrical wiring will be brand new.